Quality control

Requirements are agreed before they become inspection points.

Custom products do not share one universal test plan. Uniinox confirms the drawing, material, dimensions, interfaces, testing and release records required for each order.

01

Drawing control

Material, dimensions, tolerances, tube route, interfaces and revision status are reviewed against the approved project drawing.

02

Incoming and process checks

Material identity and project-defined dimensions are checked at the appropriate production stages according to the agreed scope.

03

Connection and assembly review

Connection orientation, mounting interfaces and visible assembly details are reviewed before release.

04

Project-defined testing

Pressure, leak, dimensional, visual or other inspection requirements must be stated in the RFQ and agreed before production.

05

Release documentation

Required records, inspection evidence, packing marks and nameplate information are defined by the order rather than assumed.

Important:

The website does not claim a certification, universal pressure rating or fixed test standard for every product. Include the required standard, inspection method and documentation in the RFQ so they can be reviewed before quotation.